| UDOT - 10400 S. Roadway Widening |
10400 South, Bangerter Hwy to Redwood Rd |
Spring 2010
|
Description: This project is being constructed by Utah Department of Transportation (UDOT). The project will widen the roadway to two travel lanes in each direction with a center median. In addition, the project will include intersection improvements at 2200 W, 2700 W, and 3200 W, bicycle lanes, 10-ft shoulders, curb and gutter, and 6-ft sidewalks on both sides of the roadway. Click here for more details |
| UDOT - 11400 S. Roadway Widening |
11400 South, I-15 to 3600 West |
Fall 2010
|
Description: This project is being constructed by Utah Department of Transportation (UDOT). The project includes:
- A new interchange at 11400 S and I-15, with new auxiliary lanes on I-15 in both directions between 11400 South and 10600 South
- Extension of 11400 South from 750 West to 1300 West including a new bridge crossing the Jordan River
- Widen 11400 South to five lanes from Bangerter Highway to State Street
- Intersection improvement on Jordan Gateway/Lone Peak Parkway at 10600 South, 11400 South, and 12300 South
- Construct a grade separated railroad crossing at 11400 S and 500 West
Click here for more details |
| UTA - Frontrunner South Project |
500 West, 9400 S to 11800 S. |
2012
|
Description: This project is being constructed by Utah Transit Authority (UTA). The FrontRunner South line will travel 45 miles along the existing Union Pacific Railroad freight corridor from the Provo Intermodal Center through Utah County to the Salt Lake Central Station in downtown Salt Lake City. FrontRunner South will feature eight stations with the possibility of adding two future stations. Click here for more details |
| UTA - Mid-Jordan Light Rail |
5600 West (9400 S. to 11600 S.) |
2011-2012
|
Description: This project is being constructed by Utah Transit Authority (UTA). The new light rail (TRAX) line will run down the existing Bingham Branch Railroad corridor in a southwesterly direction branching off of the existing Sandy/Salt Lake light rail line at the 6400 South (Fashion Place) TRAX station and extending west to 5600 West. From there, the line will turn south toward Kennecott Land's new Daybreak development in South Jordan. Click here for more details |
| 1000 West / Shields Lane Roadway Improvements |
1000 West, 9800 South to 10400 South |
Spring, 2010
|
| Description: Constructing a road to realign 1000 West with 1055 West at 10400 south. Installing a waterline from 9800 South to 10400 South. Installing a traffic signal at the intersection of 1000 W. and Shields Lane. |
| UDOT - Mountain View Corridor |
Between 5200 West & 6000 West (extends across entire City) |
TBD
|
Description: - When finished, MVC will extend 35 miles north and south from 1-80 in Salt Lake County to Lehi in Utah County
- MVC will serve 13 cities across the Wasatch Front
- MVC will include a transit line running along 5600 West
- MVC will evolve into a free-flowing freeway as improvements are made in subsequent construction phases. At the ultimate build-out, MVC will be a freeway similar to I-15 with grade-separated interchanges
Click here for more details |
| Culinary Water Storage Tank #2 & Oquirrh Park phase 2 |
4200 West 10400 South |
Fall, 2010
|
Description: The project includes:
- Construction of water storage tank with valve vault and appurtenant waterlines
- Construction of Oquirrh Park phase 2, which includes; grass, trees, and a trail around the park.
|
| Culinary Waterlines – Fire Flow Project |
Multiple locations |
Spring, 2010
|
Description: Multiple locations include:
- 2950 W. (11400 S. – 11580 S.)
- 2865 W. (11400 S. – 11070 S.)
- 10950 S. (2300 W. – 2700 W.)
- 2950 W. (10200 S. – 10400 S.)
Upsizing various existing culinary waterlines to meet state fire flow requirements. A slurry seal will be placed over the road after the waterline is installed. |
| Culinary Water Storage Tank #1B |
10200 South 2950 West |
Fall 2010
|
| Description: Constructing a 4 million gallon water storage tank with appurtenant waterlines and valve vault. |
| Tank 1b Pipelines |
10200 S. (2700 W. to 3600 W.) & 2700 W. (10200 S. to 10400 S.) |
Fall 2010
|
| Description: Installing 14-inch inlet line and 30-inch outlet line to tank 1b. Also installing overflow and drain line for the tank.
|
| East Riverfront Parkway Trailhead – phase I |
Approximately 10995 S Riverfront Parkway (900 W) |
June, 2010
|
| Description: Project is taking place in conjunction with South Valley Sewer Pump Station construction. Park improvements will take place in a two phase construction cycle. Phase I construction will include landscape improvements including irrigation, turf and landscape around pavilion and parking lot islands. Phase II (2011) will include continued irrigation, turf and trail head parking. |