By: Tina Brown On: April 18, 2017 In: Uncategorized Comments: 0

Asphalt overlay repair work for Daybreak Parkway between Oakmond Road Roundabout and Mountain View Corridor begins Apri 18. Crews will be milling and repaving the roadway surface.

Lane closures will take place between 9-5 p.m. And will continue for the next 7-10 days weather permitting. Please use caution while driving through this area.